Indonesia Elevated Toll Road

The test section for the fibre optic measurements extends over a length of 40 kilometres. Due to the topographical and geological conditions, the entire motorway will be built on a combination of bored piles and concrete supports. In cooperation with the civil engineering office MJP under the direction of Dr. Moser, the project is currently in the first implementation phase.
 

The entire project is one of the largest motorway projects in the world - the length of the total extension is 2600km.